Projects

The Final Frontier

The Final Frontier

Location: Ontario, Canada

Project Overview

The Pakwan lithium project comprises 51 claims totalling 1,271 hectares and the Margot Lake lithium project comprises 102 claims totalling 2,706 hectares

The projects are located in Frontier Lithium’s Electric Avenue, which hosts the Pak and Spark deposits. The Pak deposit has a mineral resource of measured, indicated and inferred categories of 9.3 million tonnes averaging 2.06 per cent Li2O (lithium oxide). The Spark deposit has a mineral resource estimate of 14.4 million tonnes averaging 1.4 per cent Li2O. Two other significant pegmatites, Bolt and Pennock, have also been discovered by Frontier Lithium along strike.

Project Advantages

  • Land package surrounding Frontier Lithium’s (TSXV: FL) Spak and Bolt projects in Ontario
  • Documented pegmatites within the mining district
  • Poised for a new discovery through a robust exploration program

Gabriel project

Gabriel project

Location: Nevada, USA

Project Overview

Tearlach entered into a Joint-Venture (“JV”) with Blackrock Gold Corp in Jan 2023 to acquire up to 70% interest in the Lithium rights.

The project is surrounded by Lithium-bearing assets and is positioned well for the Company to begin ground exploration and drill campaigns.

The asset is known to have excellent Lithium grade at both near-surface and at depth.

Project Advantages

  • Land package bordering American Lithium’s (TSXV: Li) high grade  deposit
  • Joint Venture with Blackrock Gold Corp (TSXV: BRC) to explore the property
  • Documented lithium-bearing zones

The Shelby

Location: Quebec, Canada

Project Overview

The Shelby is comprised of 6 properties totalling 9,701 ha and is located adjacent to Patriot Battery Metals Corvette deposit.

The Shelby is home to documented pegmatites and anomalous geochemistry (Li, Cs, Sb, Ta, Be, Rb).

Based on discoveries and geological properties of surrounding assets, the Company believes The Shelby is positioned well for a new discovery.

Project Advantages

  • Land package bordering Patriot Metals (TSXV: PMET) Corvette Property
  • Near-term exploration rollout beginning in 2023

New frontier

New frontier

Location: Ontario, Canada

Project Overview

The New Frontier Project is comprised of 3 assets in a politically safe jurisdiction

The Wesley Lithium Property comprises of 3,250 hectares and is hosted within the Sharpe Lake Batholith, a muscovite-bearing granite (Sanborn-Barrie et al., 2001).

The Harth Lithium Property comprises 2,350 hectares and is hosted within the Sharpe Lake Batholith, a muscovite-bearing granite (Sanborn-Barrie et al., 2001)

The Ferland Station is just east of Green Technology Metals, Seymour Lake Lithium deposit and is home to documented permatites.

Project Advantages

  • Politically-safe jurisdiction
  • Documented pegmatites throughout the Ferland Station
  • Promising potential based on neighbouring  assets

Chuck Ross
Suite 610 – 700 West Pender St.
Vancouver, B.C., Canada V6C 1G8

604 688-5007

info@tearlach.ca

Connect With Us

Join our Mailing list!

Subscribe to receive press releases, newsletters and Company updates